3 vessel build

PostPosted: Wed Jul 18, 2018 21:12
by iwoo
I have been doing 40 lts BIAB batches for the last 3 years. I felt it was the right time to build a 3V system. I bought a 70lts s/s kettle but this ended up becoming a HLT because the s/s keggle I acquired turned out to have rust I side (even filling it with oxalic acid for a month did not remove it) the mash tun is a pre made igloo 42 lts. ImageImageImage

Sent from my SM-G920F using Tapatalk

Re: 3 vessel build

PostPosted: Wed Jul 18, 2018 21:17
by HTH1975
Nice setup

Re: 3 vessel build

PostPosted: Wed Jul 18, 2018 21:21
by iwoo
Pipework is silicone and I have used s/s fittings throughout. I have fitted a false bottom in my aluminium keggle and I have 2 s/s circulation pumps for the mash tun and the boiler. I have tested everything out and now only need to fit the lagging and I will be ready to go. I have used the Peco elements.ImageImage

Sent from my SM-G920F using Tapatalk

Re: 3 vessel build

PostPosted: Wed Jul 18, 2018 21:23
by iwoo
I have used a set of scales on the HLT to measure the liquor.


Sent from my SM-G920F using Tapatalk

Re: 3 vessel build

PostPosted: Wed Jul 18, 2018 21:27
by iwoo
And I am going to control the temperature of the HLT with a PID controller

Sent from my SM-G920F using Tapatalk

Re: 3 vessel build

PostPosted: Wed Dec 26, 2018 16:51
by RidleyRumpus
Nice, how did it all go?